What we do with the inspection report
We turn the report into a defect schedule that says what to ask the seller for and how hard to push.
The inspection happens before your contract goes unconditional, while you can still withdraw or renegotiate. We then turn the report into a defect schedule for your conveyancer.
What the schedule shows for each defect
| Column | What it tells you |
|---|---|
| The defect and the inspector's rating | What was found |
| Indicative cost to fix | A range, so you know the size of it |
| Request strength | From strong down to note only |
| The position on paper | What the code, standard or law says |
| The practical read | How likely enforcement is, how sellers behave, and what we recommend |
The last two matter most. Unapproved work is unlawful on paper. If it is old work the seller inherited, the realistic outcome is a warning to you, not a price cut. Treating the two as the same costs you credibility on every other item.
What is negotiable
| Found | Usual outcome |
|---|---|
| Safety, structural or active termites | The seller fixes it, the price moves, or you walk away |
| Moderate items, before unconditional | Negotiated. This is where most of the movement is. |
| Cosmetic and wear | Yours to absorb |
| Anything found after unconditional | Mostly yours. Timing is the leverage. |
If two reports disagree
Get a specialist, such as a structural engineer, for anything serious. For the rest, a price credit that reflects the doubt usually settles it.
Who books the inspection
On Premium we coordinate the inspector and go through the report with you. On Essentials you book it and we introduce inspectors.
We cannot promise the seller will move. You will not make the call without the full picture.
Related: The five-priority defect rule · Standard contract clauses explained